Captured:  29 June 2018 - Pouring concrete at the bioreactor footing

Captured: 29 June 2018 - Pouring concrete at the bioreactor footing

previous next
Captured: 11 June 2019 - WAS Membrane Area Concrete Slab
Pie Chart Revised
How Biolytix Works
Step System
Rotoiti Rotomā Reticulation Map
Captured: 02 August 2018 - Pouring Bioreactor Panel
Captured: 27 August 2018 - Preparation at the effluent irrigation field
Captured: 21 August 2018 - Lifting bioreactor panels into place
Captured: 15 August 2018 - Pouring bioreactor panel
Captured: 16 August 2018 - Irrigation field piping
Captured: 22 August 2018 - Effluent irrigation field pipework to Wastewater Treatment Plant chamber
Captured: 29 June 2018 - Reinforcing the bioreactor area
Captured: 29 June 2018 - Pouring concrete at the bioreactor footing
Captured: 20 July 2018 - Installing drainage system that links to effluent irrigation field
Captured: 10 June 2019 - Filling The Biofilter
Captured: 6 June 2019 - Sludge Skip Slab
Captured: 11 June 2019 - Screen Pump Station And Flow Balance Slab
Captured: 11 June 2019 - Screen Pump Station And Flow Balance Slab Reinforcing
Captured: 11 June 2019 - Laydown Slab
Captured: 24 May 2019 - Access Road Chip Seal